Hi Philip!

Thanks, this was extremely useful.  So for my example the .svx would be:


* data diving FROM TO LENGTH BEARING FROMDEPTH TODEPTH
A B 25 160 12 16
B C 12 120 16 20

* data passage station left right up down
A 1 2 3 4
B 2 3 4 5
C 3 4 5 6


So, more questions!

- What does the "*data default" and "*end ice" signify?  Are they required?

- Is uppercase/lowercase important? (Since "FROM TO ..." is uppercase and
"station left right.." is lowercase)

Cheers,
Henrik


On Mon, Apr 13, 2015 at 12:10 PM, Philip Maynard <Philip.Maynard at uts.edu.au>
wrote:

> Hello Henrik,
>
> Here's an extract from a mixed cave - dive data plus normal data - that we
> surveyed.  The first bit is normal cave data.
>
> Cheers, Phil
>
>
> On 13/04/2015, at 4:33 AM, Henrik Brautaset Aronsen wrote:
>
> > Hi.
> >
> > I'm new to Survex, and have a tiny question just to get me started:
> >
> > Say I have three stations, with depth for each station (e.g.
> 12m,16m,20m),
> > and the compass heading (e.g. 160°,120°) and length of the line between
> > each station (e.g. 25m,12m).  What would my .svx file look like?
> >
> > And what if I in addition have the distance to the left wall/right
> > wall/roof/floor on each station?
> >
> > Thanks,
> > Henrik
> > --
> > Sent from my phone
> > --
> > Survex http://lists.survex.com/mailman/listinfo/survex
>
> ; Surveyed: 5/12/2003
> ; Ian Cooper
> ; Simon Goddard
> ; Rod O'Brien
>
> IPL100 IPL101  4.14    143     -42.5 ; 100 0.5m Mite
> IPL101 IPL102  4.65    139       0.5 ;
> IPL102 IPL103  7.37    169     -12   ;
> IPL103 IPL104 11.49    170     -14   ; 103 10cm Stal over 2c.
> IPL104 IPL105  6.00    173.5   -10.5 ; 104 Marked wall pt on left.
> IPL105 IPL106  4.00    229       0   ; 105 Sump wall at water level.
>  ; 106 Sump wall at water level.
> IPL105 IPL107  7.40    090       0   ; 107 Tip of lower big rock below mud
> climb.
>
> IPL002 IPL110  3.29    268.5    13.5 ; 102 Pencilled corner on left.
> IPL110 IPL111  4.70    228     -26   ;
> IPL111 IPL112  1.43    261     -20   ;
> IPL112 IPL113  8.00    245     -18   ;
> IPL113 IPL114  1.93    218     -64   ; 113 Marked wall point.
>  ; 114 Mite.
> IPL113 IPL115  4.93    182     -25   ; 115 Marked wall point.
> IPL115 IPL116  7.11    288     -33   ; 116 Marked wall knob.
>
> * data passage station left right up down
> IPL100 2 2 2 0.4
> IPL101 1 0.6 0.8 0.3
> IPL102 2 2.2 5 0.6
> IPL103 0.6 0.5 0 2.3
> IPL104 0.5 5 2 1.3
> IPL105 1.5 2 4 0
> IPL106 0.2 0.2 0.3 0
>
> * data passage station left right up down
> IPL105 3 0 4 0.1
> IPL107 0.3 2.1 4 0.1
>
> * data passage station left right up down
> IPL002 4 3 3 2
> IPL110 0.4 0.4 0 1
> IPL111 0 0.4 1.8 1.8
> IPL112 0 0.4 4 1.5
> IPL113 1.2 0 5 0.6
> IPL114 1.1 0.5 8 0.5
>
> * data passage station left right up down
> IPL113 1.6 0 8 0.5
> IPL115 0 1 1 1.5
> IPL116 0 0.5 0.5 0.6
>
> * data default
>
>
> ; Ice Pick Lake dive surveys
> ; Surveyed: 11/1/2014
> ; Phil Maynard
> ; Alex Boulton
>
> * data diving FROM TO LENGTH BEARING FROMDEPTH TODEPTH
> IPL104 IPL200 1.0 270 1.3 1.0
> IPL200 IPL201 9.4 175 1.0 -4.4
> IPL201 IPL202 4.7 170 -4.4 -7.4
> IPL202 IPL203 6.7 165 -7.4 -7.0
> IPL203 IPL204 9.9 140 -7.0 -8.0
>
> ; Surveyed: 12/4/2014
> ; Phil Maynard
> ; Alex Boulton
>
> * data diving FROM TO LENGTH BEARING FROMDEPTH TODEPTH
> IPL204 IPL205 5.1 190 -8.0 -11.3
> IPL205 IPL206 4.2 225 -11.3 -12.6
> IPL206 IPL207 8.4 260 -12.6 -15.2
> IPL207 IPL208 3.2 210 -15.2 -16.4
> IPL208 IPL209 1.8 180 -16.4 -15.9
> IPL209 IPL210 4.7 210 -15.9 -16.2
> IPL210 IPL211 1.5 080 -16.2 -15.8
>
> ; Surveyed: 13/4/2014
> ; Phil Maynard
> ; Alex Boulton
>
> * data diving FROM TO LENGTH BEARING FROMDEPTH TODEPTH
> IPL211 IPL212 9.7 140 -15.8 -12.9
> IPL212 IPL213 2.0 125 -12.9 -13.2
> IPL213 IPL214 2.4 105 -13.2 -11.2
> IPL214 IPL215 5.9 175 -11.2 -11.5
> IPL215 IPL216 7.5 180 -11.5 -9.6
>
> ; Surveyed: 10/5/2014
> ; Deborah Johnston
> ; Alex Boulton
> ; Rod Obrien
>
> * data diving FROM TO LENGTH BEARING FROMDEPTH TODEPTH
> IPL216 IPL217 4.1 159 -9.6 -8.9
> IPL217 IPL218 8.2 122 -8.9 -8.1
> IPL218 IPL219 7.4 319 -8.1 -3.6
> IPL219 IPL220 5.0 121 -3.6 0
> IPL220 IPL221 2.5 128 0 0
>
> * data passage station left right up down
> IPL200 1.0 0 2 1.3
> IPL201 0 0.7 4 1
> IPL202 0.3 0.7 2 2
> IPL203 0 1 1 0
> IPL204 0.8 0 0.6 2
> IPL205 1 0.3 1 2
> IPL206 0.6 0 1 2
> IPL207 0 0.8 2 2
> IPL208 1 0 0 1
> IPL209 0 1 1 3
> IPL210 0 0.7 2 2
> IPL211 1 0 2 1
> IPL212 0 0.7 0.5 1
> IPL213 0 0.6 0.3 1.8
> IPL214 1 0 0.6 2
> IPL215 0.7 0 0.5 2
> IPL216 1.2 0 1 6
> IPL217 0.8 0 2 2.1
> IPL218 0.5 0 2 3
> IPL219  0.5 0.2 0.2 6
> IPL220 0 0.5 2 8
> IPL221 1 0.4 2 8
>
> * data default
>
> * end ice
>
>
>
>
> UTS CRICOS Provider Code: 00099F
> DISCLAIMER: This email message and any accompanying attachments may
> contain confidential information.
> If you are not the intended recipient, do not read, use, disseminate,
> distribute or copy this message or
> attachments. If you have received this message in error, please notify the
> sender immediately and delete
> this message. Any views expressed in this message are those of the
> individual sender, except where the
> sender expressly, and with authority, states them to be the views of the
> University of Technology Sydney.
> Before opening any attachments, please check them for viruses and defects.
>
> Think. Green. Do.
>
> Please consider the environment before printing this email.
>


More information about the Survex mailing list