And even though I haven't had a chance to get to it in a while from too much pressure for work, my 7 parameter format (excluding cross section shape) is still there. See: http://www.goatchurch.org.uk/Tunnel/xsecto.html Every cross-section convention I have ever heard used can be modelled by this format. Julian T.